Solar Farm near Pallet Hill

About the Solar Farm Near Pallet Hill

The Council has set the ambitious target of significantly increasing the share of renewable energy sources in the future. This is in line with local, national and international targets set in an attempt to reduce our dependence on fossil fuels and, thus, combat global warming.

A solar park is permitted for a maximum period of 40 years. After this period, the site of the solar park will be cleaned up and the land will be given back its former use.

A ground-based solar park offers opportunities to enhance the environment around it through appropriate mitigation measures. Preservation of the land through low disturbance of the ground is only one side of the coin. With a solar farm, the opportunity to plant a species-rich mix of grassland arises. This not only enhances the biodiversity of the terrain, which is usually comprised of a poor grassland monoculture, but it provides foraging opportunities for animals in the surrounding ecosystem. This also applies to the vegetation around the solar park, such as hedges and trees, which are more sensibly managed providing additional shelter for the local fauna and flora.

Renewable energies are becoming an integral part of the English landscape and its society, and its depolyment will increase even more in the future. Having a solar farm fully integrated into the landscape not only has the benefit of locally produced green electricity, but it provides the surrounding community with a sense of pride thanks to their active contribution to the national goals of clean energy generation.

We look forward to hearing your suggestions and comments on how to best integrate the solar park into the proposed setting.

The panels will be placed at a maximum height of 2.6 to 3 metres.

The Pallet Hill Solar Farm has a capacity of approximately 20 Megawatts. That is equivalent to clean energy supply for approximately 5,060 households. The energy generated will be fed into the national electricity grid.

The landscaping and natural integration of this project requires the installation of multiple fences and the planting of hedges, both new ones and reinforcement of already present vegetation. To secure the solar park, the site boundaries will be fenced with a deer fence that is separated from the solar panels by 3 metres and allows for a maintenance path. The fence is required to prevent theft and destruction of the solar panels as much as possible and is a requirement of the insurance company.

Pre-application request:

The council makes an initial revision of the project and suggests the scope of the detailed studies that are necessary for the future submission of the application.

Stakeholder consultation:

By means of personal conversations, a walk-in evening and reactions via this website, Kronos Solar provides an open space to discuss how the plan will fit in with the landscape and how it will be designed. This may include comments about, for example, screening and visibility of the park, the layout of the solar farm, the construction of the driveway and the wishes for ecological improvements at the location. Together with a landscape architect, the (technical) possibilities can be examined. Overall, the aim is to minimise the impact on the surroundings. Following the public consultation, adjustments will be incorporated into the plan.

Planning permission:

After Kronos Solar puts together the required documentation and reviews the comments of the local community, the Council will examine whether the proposal meets all the requirements and fits into the policy plans. The project is validated, after which it is available for public inspection. If there are no objections during the 6-week judicial review period, the municipality issues a decision, after which the permit is granted.

Construction phase:

As soon as the financing has been arranged and all the contracts with suppliers have been concluded, the construction phase can begin.

The construction of the solar park will take about three months. During these months various construction stages will be completed, starting with the installation of the fencing and the internal infrastructure, the delivery of the materials on site and the setting up of the (temporary) building security system. After that, the installation of the substructure takes place and finalizes with the installation of the panels. Finally, the cabling for the electrical connection is laid. Parallel to this, the grid manager will work on the connection work in and around the customer station.

These various phases ensure that the inconvenience caused by the construction is minimal and it is also accompanied by a traffic management plan to avoid disruptions to the local highway network.

Operational phase:

Upon completion of the project, the solar farm becomes operational. The sustainably generated electricity is supplied to customers via the public electricity grid and actively constributes to the national Net Zero Target. Kronos Solar will have the ecological management carried out by a professional organisation and technical any faults will be resolved as soon as possible by appointed professionals as well. Controlled pasture management and rainfall will help in the upkeep of the park and on-site mainatainance will occur only a few times per year.

Dismantling:

After 40 years, the solar park will be dismantled and the plots of land will be delivered in their original state. For this purpose, Kronos Solar will instruct an organisation that focuses entirely on the sustainable dismantling and recycling of (used) solar panels.

The exact cable route is determined by the network operator and agreed with the Council prior to construction. The network operator applies for a separate license for this.

Kronos Solar is a German company with international operations. We have been a stable player in the deployment of large-scale solar farm projects for many years with a proven track record. We have experience developing ground-based solar parks on pasture, fallow land and former industrial areas.

We are one of the fastest growing developers in the market and are currently active on 4 continents, in 9 different countries. Other than the UK, we are also active in France, Germany and the Netherlands. We pride in our portfolio of over 60 developed projects and have a success rate in obtaining the planning permission of more than 90%.

Kronos’ success is based on a direct connection with the local stakeholders of our projects and a keen eye for quality and cost-effectiveness. As an independent developer, Kronos Solar is able to combine the most suitable locations, technologies and partners to realise responsible, sustainable, solar energy projects.

Due to the complexity of the projects, Kronos Solar chooses to be involved from A to Z, paying a lot of attention to cooperation with local parties and a sustainable integration of the landscape in order to create added value for the environment.

You can find more information on our website.

The best way to contact us is via the contact form on this website.

The targets for the generation of renewable energy are very ambitions and we need to pick up the pace. The United Kingdom wants to reduce its emissions by 80% by 2050 and solar photovoltaics has an important role to play: 80GW need to be installed in the next 40 years and every council needs to play its part. A solar park of this size will enable the Council to take a major step towards achieving these objectives.